HYDRO-ELECTRIC POWER PLANTS 371Pa
AH 0
HpahB
CDE
hdFig. 11.26Ea = Eb = H + hd +pa
ρEc = h +hd +22Vc
g+ cp
ρEd =22Vd
g+ dp
ρ.WZ (work done per kg of water passing through the turbine) = Eb – Ec = Eb – (Ed + hf)where Ec = Ed + hf where h is the head lost by water passing through the draft tube (friction and
other losses).
= d ap
Hh
++
ρ22dd
fVp
h
g
++
ρ=22H Vd
g
−
+ hd ppad
+−
ρρ- hf
The pressure at the point D and E must be same.∴ dp
ρ= ap
ρ+ hdSubstituting this value in the above equation, we getW 2 =22H Vd
g
−
- hf
= H –22Vd
gin hf is taken as zero ...(b)