Energy Project Financing : Resources and Strategies for Success

(singke) #1

356 Energy Project Financing: Resources and Strategies for Success


11 IESNA Publications, New York, New York. TEL: 212-248-5000, http://
http://www.iesna.org.


12 Lawrence Berkeley National Laboratory (LBNL), Berkeley CA. TEL: 5
10486-6156, Email: [email protected], http://eetd.lbl.gov


13 National Association of Energy Service Companies (NAESCO), Wash-
ington, D.C. TEL: 202-822-0950, http://www.naesco.org


14 Energy Information Administration (EIA), Department of Energy, Wash-
ington, D.C., TEL: 202-586-8800, http://www. eia. doe. gov


15 National Renewable Energy Laboratory (NREL), Boulder, Colorado,
TEL: (303) 275-3000, http://www.nrel.gov


16 National Technical Information Service (NlST), U.S. Department of Com-
merce (This is repository for all publications by the Federal labs and
contractors), Springfield Virginia. TEL: 703-605-6000, http://WWW.ntis.
gov


17 Oak ridge National Laboratory (ORNL), Oak Ridge, Tennessee, Tel: (865)
574-5206, http://www.ornl.gov/ORNL/BTC


18 Pacific Northwest National Laboratory (PNNL), Richland, Washington,
Tel: (509) 372-4217, http://www.pnl.gov/buildings/


Appendix A


Examples


Option A Example: Lighting Efficiency Retrofit


Situation
More efficient fixtures are installed in place of existing fixtures in a
school to reduce energy requirements, while maintaining lighting levels.


M&V Plan
An M&V Plan was developed showing that Option A was to
be used for savings determination because partial measurement was
deemed to provide adequate accuracy. An outline of the Plan is shown
below:

Free download pdf