Starting and charging - Starting system

Starting and charging


Starting system


Inspection........................................................



  1. Starter installation components
    Note: this test must be finished within 3 to 5 seconds to
    avoid burning out coil.
    (a) Remove nut at C terminal to uncouple wire of field coil.
    (b) As shown in the diagram, connect battery wire to electro-
    magnetic switch, and check drive pinion is pushed outside,
    (pull-in coil and hold-in coil).


(c) As shown in the diagram, uncouple negative wire from ter-
minal C after the above connections, and check drive pin-
ion is still at the state of being pushed outside.(Hold-in coil)

(d) Push drive pinion toward armature side, and measure the
clearance between drive pinion end and stop ring.
Standard clearance: 1.0~5.0mm

(e) Uncouple negative wire from electromagnetic switch
housing, and check drive pinion returns back to original
position toward inside.

79

Terminal C

Terminal 50

Terminal C

Terminal 50

Terminal C

Terminal 50