102 Designing and making stairs to current building regulations
SITE MEASUREMENTS
Traditionally, accurate information required for the
production of wooden stairs was considered essen-
tial; measurements on working drawings produced
by others (and the newly- built stairwell) were not
assumed to be correct, unless checked on site by an
experienced, responsible person.Advanced Craft joinery students made it and helped
me to install it in 1989. Note the listing of the various
regulations that are ticked as having been met.
Meticulous checks like this are essential at the design
stage.
UpBullnose
stepMetric scale 1:10Ex 75 × 75 mm
Newel postBulkhead
position
aboveHandrail
900 mm above
pitch line2134567891011121.670m13
141516 ‘B’1.793 m
‘A’ or ‘B’ extended joists
to be taken into loft space
to achieve a degree of
cantileverage to landing
Extended
joistsLevel
handrail
balustrade
900 mm above
landingForm opening in stud
wall to attic area‘A’2.820mMeeting the stair regulations
Total rise = 2950 ÷ 16 = 184.37 mm rise
Going on straight flight = 220 mm
2R+G on straight flight = 588.74 mm
2R+G on tapered steps = 603.74 mm
Pitch on straight flight = 40º
Pitch on tapered steps = 38ºü ü ü ü ü üEx 75 × 40 mm
half newel postFigure 6.27
Staircase designed
and installed in an
actual loft conver-