Project summary^1
The Casecnan Water & Energy project consists of structures in the Casecnan and Denip
Rivers that divert water into a 23-metre tunnel into the Pantabangan Reservoir for irriga-
Type of project
Irrigation and hydroelectric power facility.Country
The Philippines.Distinctive features
- One of the largest irrigation and hydroelectric power generation projects in the
 world.
- One of the largest high-yield project bond offerings.
- Large amount of financing for a Philippine project.
- Financing divided into several tranches to appeal to different investors’ interests.
 •Tight time frame for original financing.
- Default by South Korean equipment, procurement and construction (EPC) contrac-
 tor, subsequent drawing under standby letter of credit and refusal by opening bank
 to pay.
- Strain on project liquidity and need for parent support because of construction
 delay.
Description of financing
The 1995 financing was in three tranches, all placed privately under Rule 144A:- US$100 million in senior secured notes, Series A, due in 2005;
 •US$181 million in senior secured bonds, Series B, due in 2010; and
- US$75 million in floating-rate notes due in 2002.