Project Finance: Practical Case Studies

(Frankie) #1

Chapter 15


Casecnan Water & Energy Company,


the Philippines


Project summary^1


The Casecnan Water & Energy project consists of structures in the Casecnan and Denip
Rivers that divert water into a 23-metre tunnel into the Pantabangan Reservoir for irriga-


Type of project


Irrigation and hydroelectric power facility.

Country


The Philippines.

Distinctive features



  • One of the largest irrigation and hydroelectric power generation projects in the
    world.

  • One of the largest high-yield project bond offerings.

  • Large amount of financing for a Philippine project.

  • Financing divided into several tranches to appeal to different investors’ interests.
    •Tight time frame for original financing.

  • Default by South Korean equipment, procurement and construction (EPC) contrac-
    tor, subsequent drawing under standby letter of credit and refusal by opening bank
    to pay.

  • Strain on project liquidity and need for parent support because of construction
    delay.


Description of financing


The 1995 financing was in three tranches, all placed privately under Rule 144A:


  • US$100 million in senior secured notes, Series A, due in 2005;
    •US$181 million in senior secured bonds, Series B, due in 2010; and

  • US$75 million in floating-rate notes due in 2002.