Simulink Control Design™ - MathWorks

(Tuis.) #1
As shown in the Actual Value column, the trimmed output value is within the specified
bounds.

Extract Operating Point from Report


The operating point search report is read-only and contains information about both the
specifications and the trimmed operating point. You can extract either a specification or
operating point object from a search report. For example, on the Report tab for
report2, click Extract > Operating Point.

1 Steady-State Operating Points

Free download pdf