WOODWORKINGName:____ Date:_____
Project:____Current Grade:
Grading Scale: 1= Poor 2= Needs work 3= Good 4= Well done 5= Excellent
Grading Notes: Plus sign (+) = progressing saƟsfactory, work complete, demonstrates competence.
Zero (0) = no progress evident, needs improvement, demonstrates lack of understanding.
Minus sign (‐) = conƟnued failure to show progress, does not follow instrucƟon, incompetence.
Project Planning
A. Portfolio Preparation (week 1)..................................................................................... - Work agreement: _____
(Typed work agreement with personal work ethic code and commitment signed by parent and
student, Valley Oaks expectaƟons, teacher signature, current date, target date of compleƟon) - Company name: _____
- Logo: _____
B. Idea samplers (week 2).................................................................................................. - Ideas: _____
(Magazine clippings, photographs, computer images, catalog adverƟsements of desired project)
C. Standard title block (week 3)........................................................................................ - Margin framing: _____
(Thick, black lines, ½” from edge of paper, uniform lines) - InformaƟon block: _____
(To be used on every page of porƞolio: Logo and/or company name, name,
class name, date, project Ɵtle, scale, page number)
D. Pictorial Sketch (week 4)............................................................................................... - Rough sketch: _____
(Isometric or pictorial sketch of project)
E. Drafting sketches (week 5)............................................................................................ - Three Views: _____
- Overall Dimensions: _____
- Important Notes: _____
(Labeling, joinery notes, hardware notes, wood type notes)
F. Overall work ethic..........................................................................................................
(Daily work ethic evaluaƟon: CooperaƟon, diligence, and behavior)Progress Check Total:Grade Report:
□ Missing Prompts
□ Low Test Scores
□ Undeveloped Project PreparaƟon
□ Project Plans do not meet draŌing standards
□ Project construcƟon lacks progress
□ Overall Work Ethic needs improvement30PreparaƟonSample IdeasTitle BlockPictorial SketchDraŌing SketchWork EthicAppendix: Project Check 1