6 φ
M.S. links throughout
20
φ M.S. bars for
bonding to pile cap
1 000
960
10
14500500
1 000
1 040
Links @ 40 crs
Links @ 120 crs
Spacing transition
Spacing transition
Links @ 40 crs
40 cover to links
300
300
25 chamfer
Lifting lug 2
900 from toe
Cast steel shoe
1no. 7-wire 12.5dia. H.T.S. strandin each corner
1no. 7-wire 12.5dia. H.T.S. strand
Lifiting lug 2
900 from head
40 cover
15 00010 500
1150
1050
100 100
(^1120) Transition
Transition
Transition
Transition
40 cover to links
Lifting hole at 7
700 from head
8 φ
links^8
φ M.S. links throughout
8 φ
Helix at
50 pitch
B
25
φ M.S. main bars
25
φ H.T.S. main bars
8 φ
M.S. links throughout
25
φ M.S. main bars
350
350
1500
17 100
1450
1450
23 000
1500
1075
Lifting point at 5000 from head
Links @ 70 crs
Links @ 175 crs
Links @ 70 crs
Links @ 50 crs Cast steel body
A A
Hardened steel point
90 dia.
Links @ 150 crs
Links @ 50 crs
500
500
SECTION A-A
SECTION B-B
(a) (b)
B
Helix at 50 pitch
Figur
e 2.5
Design f
or pr
ecast concr
ete piles (a) 350
mm squar
e pile 15
m long (b) 500
mm octag
onal pile 23
m long.
Figur
e 2.6
Design f
or pr
estr
essed concr
ete pile
.