Equipment of the type described in Section 3.3 is used to drill-out the soil from within a
tubular pile. Where rotary methods are used centralizers are required to keep the drilling
pipes in line with the pile axis. A Calweld drill was used to clean out the soil from within
the 2000 and 2200 mm outside diameter steel tubular piles used for the breasting and
mooring dolphins of The British Petroleum Company’s tanker terminal in the Firth of Forth.
To install the vertical piles, a rotary table and guide frame were mounted on top of the pile
as shown in Figure 8.16. A full-face drilling bit was used and the cuttings were removed by
air–water reverse circulation up the 200 mm drilling pipe. The drill bit was maintained in
correct alignment by centralizers and a heavy collar was provided to maintain pressure on
420 Piling for marine structures
Figure 8.16Drilling soil from within 2200 mm ODpiles using reverse-circulation drill (Forth
Tanker Terminal,The British Petroleum Co.).
Guide frame
Water and air swivel
Rotary table
200 kN-m at 12 r.p.m.
Centralizer
200 drill pipe
2200 O.D. steel
tubular pile
Guides Deck of jack-up
barge
Barge leg
Weight collar
1 829 dia.×6 706
Drilling bit
Sea bed
Sea level
Water delivery
to pile