Measurements made in the centrifuge model of pile head deflections, bending moments,
and deduced horizontal soil pressures on the surfaces of the central pile of the three-pile row
furthest from the embankment are shown in Figure 9.18. They show a marked difference in
the magnitude of deflection and pressure between the short-term (end of construction) and
long-term (125 weeks after end of construction) loading periods. The pressure on the pile
surface within the soft clay was negative at the end of construction as a result of the large
deflections causing the pile to pull away from the soil. With time the clay closed-up against the
Miscellaneous piling problems 459Figure 9.18Lateral pressure distribution on full height bridge abutment supported by two rows
of piles driven through soft clay into dense sand (a) deflection (b) bending moments
(after Springman et al.(9.25)). Crown copyright 1995. Reproduced by permission of HM
Stationery Office.
(b)(a)5.0010.015.0- 10 – 55
Bending moment (MN/m)
Depth below soft clay surface (m)
0101520.05.0- 100 0
Pressure
PressureAbutment wall
Fill
8.0 m6.0 m5.0 m
1.0 m dia RC piles13.0 mGLSoft
clayDense
sandLong termShort termKeyDrainage
layer10.015.0- 50 0 100
Deflection (mm)
DeflectionDeduced pressure (kN/m^2 )Depth (m)50 150 200200100 300 400 50020.0