Ground investigations, contracts and testing 523Where piles are installed through fill or soft clay these materials give positive support in
shaft friction to the test pile, whereas they may add to the working load in negative shaft
friction on the permanent piles. It may therefore be desirable to sleeve the pile through these
layers by using a double sleeve arrangement. Alternatively, the outer casing can be with-
drawn, after filling the annular space between it and the steel tube encasing the test pile with
a bentonite slurry.
It is inadvisable to test raking piles by a reaction from kentledge or tension piles since the
horizontal component of the jacking force cannot be satisfactorily restrained by the jacking
system. Cable anchors inclined in the same direction as the raking piles can be used but it
is preferable to determine the ultimate or allowable loads on raking piles by installing
special vertical piles for loading tests.
Yoke Universal beamsBracing
'Load cell
Hydraulic jackTest pile
3 B
(not less than 2.0 m)BCap cast
on to head
of test pileAnchor piles
Four dial gaugesDial gauge
supportsTension
membersFigure 11.8Testing rig for compressive test on pile using tension piles for reaction.
SaddlesFour dial
gaugesUniversal beamsLoad cell
Dial gauge supports Hydraulic jackCap cast on
to head of
test pile
Test pile
B3 B
(not less than 2 m)Cable anchorsFigure 11.9Testing rig for compressive test on pile using cable anchors for reaction.