423
Appendix B
© 2009, AWI, AWMAC, WI - Architectural Woodwork Standards - 1st Edition, October 1, 2009
(Appendix B is not part of the AWS for compliance purposes)
G. [Factory Finishing:
This Item will not apply to HPDL, Solid Sur face, or SPC paneling. As noted above, Factor y Finishing
is strongly recommended. In addition to getting a better finish, you are moving the air quality problems
off site, where a proper spray booth will protect the environment and the health of the finishers.
- All products provided in this Section shall be factory finished using Architectural Woodwork Standards
finishing system [ _____ ]. - Finish shall be AWS [Premium] [Custom] Grade.]
PART 3 - EXECUTION
3.01. EXAMINATION
A. Verify the adequacy and proper location of blocking and support framing.
B. Verify that mechanical, electrical, plumbing, and other building components (supplied by others), affecting work in this
Section are in place and ready.
3.02. INSTALLATION
A. Install all work in conformance with the Architectural Woodwork Standards, latest edition.
- Installation shall conform to the AWS Grade of the items being installed.
B. All work shall be secured in place, square, plumb, and level.
C. All work abutting other building components shall be properly scribed.
D. Mechanical fasteners at exposed and semi-exposed surfaces shall be countersunk and filled.
3.03. ADJUSTING & TOUCH UP
A. All nicks, chips, and scratches shall be [sanded smooth] [filled and retouched]. Damaged items that cannot be
repaired shall be replaced.
Use “sanded smooth” if the work is to be finished at the job site. Use “filled and retouched” if the
materials are to be factory finished.
3.04. CLEANUP
A. Upon completion of installation, the installer shall clean all installed items of pencil and ink marks, and broom clean the
area of operation, depositing debris in containers provided by the general contractor.
END OF SECTION
CSI Section 06 42 00
Paneling
B