Smart Buildings Systems for Architects, Owners and Builders

(ff) #1

Logical link control (LLC), 10
LonTalk, 21, 46, 49, 105, 110
LonWorks, 23, 204


M
Maintenance, 42–43, 45, 59–60, 106, 114, 133,
134, 135–136, 165, 166, 176
Management information base (MIB), 67–68
Management level, 44–45
Mass notification systems, 110–111
Master meter, 66
Material management, 132
Measurement, 198
Mechanical engineers, 142
Mechanical, electrical, and plumbing (MEP),
185
Media access control (MAC), 10, 124
Media controller, 99
Media players, 99
Media processor, 99
Media retrieval, 95, 96
Media servers, 99
Mesh, 18, 19
Microphones, 96–97, 170–171, 172, 173, 174
Middleware, 182–184, 183f
Mixer, 173
Modbus, 23–24
Monitoring, 50, 51, 60, 61, 73, 83–84, 88–89,
107, 108, 109, 133, 135, 158, 176–177
MPEG, 85, 94
Multiplexer, 86–87


N
National Fire Protection Association (NFPA),
103–104
Network address translation (NAT), 125
Network layer, 10
Network operations center, 204
Network servers, 125–126
Network switches, 124–125
Notification devices, 108–109


O
Occupancy sensors, 48, 50, 51–53, 54
ODBC, 26–27, 75, 151
OPC, 24–25
Open
architectures, 165
area partitions, 51–52
cable infrastructure, 11–12
class A circuits, 106–107
communication networks, 8


communication protocol, 20
database connectivity, 26–27
devices, 18, 73, 94
door access, 71, 73
information, 61
network architecture, 25
network standards, 8, 182
Open Database Connectivity (ODBC)
interface, 26
systems, 26–27, 113–114
Open system interconnection (OSI), 8, 124, 182
Operations, 25, 31–32, 43, 44, 45, 71–72,
104–105, 106–107, 158
Outdoor air–delivery monitoring, 198
Owner representatives, 143

P
Packaged integration, 180–181
Packet-switched data network (PSDN), 110
Passive infrared (PIR), 51–52
Pathways, 3–4, 13, 16, 160, 162–163, 166
PDA, 88–89
People counters, 79–82
People management, 82
Peripheral devices, 72–75, 121–122
Personal computers/user devices, 123–124
Phantom power, 28
Photoelectric controls, 54
Physical layer, 9–10
Pico cells, 119
Plasma, 88, 98, 174, 175
Power strips, 67
Power-over-Ethernet (POE), 67–68, 75–79,
85, 116, 164
POE Plus, 29
Power-sourcing equipment (PSE), 28
Powered access control systems, 75–79
Powered device, 28
Presentation layer, 11
Private branch exchanges (PBX), 113–114
Procurement management, 133
Programmable lighting control system, 204
Programmable logic controllers (PLCs), 23–24
Project conception, 140
Project delivery, 141
Project designers, 186
Project management, 163
Projector, 171, 174, 175, 176–177
Property management system (PMS), 184
Proprietary
add-ons/extensions, 25
building systems, 3f,4f

Index 229
Free download pdf