WORKED EXAMPLES 665
Worked Example 15.2
At a depth of 20 m, waves of height 1.31 m and period 7 s are observed to
travel inshore. Estimate the run-up of the waves on the composite slope as
shown in Fig. 15.15.
Solution
At the place of observation, H1.31 m, d20 m and T7 s. From Fig.
14.4,L70 m, and from Fig. 14.3, c10.2 m s^1.
L 0 76.5 m.
For d/L 0 20/76.50.26, H/H 0 0.95 (Fig. 14.8) and so H 0 1.31/0.95
1.38 m.
WAVE BREAKING
0.38
1/3
(equation (14.41))
Hb2.0 m; db2.0/0.782.56 m.
RUN-UP
- First trial.Assume a run-up of 2 m above SWL. The horizontal dis-
tance from the wave breaking section to the run-up, s10.0
5 6 5.626.6 m. The vertical distance is 2.02.564.56 m. The
average slope is 4.56/26.60.17.
1.0160.17
0.5
(equation (15.21))
1.28
Ru1.281.381.8 m.
1.38
76.5
Ru
1.38
Ru
H 0
1.38
76.5
Hb
1.38
gT^2
2 π
Fig. 15.15 Sea wall of composite slope (Worked example 15.2)