DHARM
430 GEOTECHNICAL ENGINEERING
27 f
361.5
52 f
60 f
25
25
13
6,
12 holes
f
Guide length
of travel of
rammer 310 mm
6,
4 holes
f
(a) For light compaction
335
50 f
50 f
20
65 f
Rammer
(Adjust to make
total weight
26 N)
15 mm thick
rubber gasket
27 f
581.5
52 f
60 f
25
25
13
6,
12 holes
f
Guide length
of travel of
rammer 450 mm
6,
4 holes
f
500
130
50 f
20
65 f
Rammer
(Adjust
total weight
48.9 N)
1.5 mm thick
rubber gasket
25 f
Note:
- Essential dimensions
underlined - All dimensions in mm
(b) For heavy compaction
Fig. 12.6 Typical metal rammer for compaction (ISI)
The ratio of fraction passing 20-mm IS Sieve and retained on 4.75-mm IS Sieve to the
soil passing 4.75-mm IS Sieve should be determined. The material retained on and passing
4.75-mm IS Sieve should be mixed thoroughly to obtain about 160 to 180 N of soil specimen.
(In case the material passing 20-mm IS Sieve and retained on 4.75-mm IS Sieve is more than
20%, the ratio of such material to that passing 4.75-mm IS Sieve should be maintained for
each test. IF it is less than 20%, the material passing the 20-mm IS Sieve may be directly
used).