DHARM
42 GEOTECHNICAL ENGINEERING
Handle
Hole
Cylinder
Cover plate
of shutter
Shutter
Cone
100 mm
100 mm
125 or
150 mm
(a) Sand-pouring cylinder (b) Calibrating container
Fig. 3.7 Sand pouring cylinder
The procedure consists of calibration of the cylinder and later, the measurement of the
unit weight of the soil.
(a) Calibration of the Cylinder and Sand: This consists in obtaining the weight of sand
required to fill the pouring cone of the cylinder and the bulk unit weight of the sand. Uni-
formly graded, dry, clean sand is used. The cylinder is filled with sand almost to be top and the
weight of the cylinder with the sand is taken (W 1 ).
The sand is run out of the cylinder into the conical portion by pulling out the shutter.
When no further sand runs out, the shutter is closed. The weight of the cylinder with the
remaining sand is found (W 2 ). The weight of the sand collected in the conical portion may also
be found separately for a check (Wc), which should be equal to (W 1 – W 2 ).
The cylinder is placed centrally above the calibrating container such that the bottom of
the conical portion coincides with the top of the container. There sand is allowed to run into
the container as well as the conical portion until both are filled, as indicated by the fact that no
further sand runs out; then the shutter is closed. The weight of the cylinder with the remain-
ing sand is found (W 3 ). The weight of the sand filling the calibrating container (Wcc) may be
found by deducting the weight of sand filling the conical portion (Wc) from the weight of sand
filling this and the container (W 2 – W 3 ). Since the volume of the cylindrical calibrating con-
tainer (Vcc) is known precisely from its dimensions, the unit weight of the sand may be ob-
tained by dividing the weight Wcc, by the volume Vcc. (Wcc may also be found directly by strik-
ing-off the sand level with the top of the container and weighting it).
The observations and calculations relating to this calibration part of the work will be as
follows:
Initial weight of cylinder + sand = W 1
Weight of cylinder + said, after running sand into the conical portion = W 2
∴ Weight of sand occupying conical portion, Wc = (W 1 – W 2 )
Weight of cylinder + sand, after running sand into the conical portion and calibrating
container = W 3
∴ Weight of sand occupying conical portion and calibrating container = (W 2 – W 3 )