DHARM
714 GEOTECHNICAL ENGINEERING
9810
8829
7848
6867
5886
4905
3924
2943
1962
981
0
100
90
80
70
60
50
40
30
20
10
0
Unit load, kg/cm
2
No correction
required
Corrected 2.5 mm
penetration
Corrected
5 mm penetration
Corrected for concave
upward shape
Unit load, kN/m
2
5.0 7.5 10.0 12.5
Penetration, mm
Fig. 17.3 Load vs penetration curves for CBR test
where PT = Corrected unit (or total) test load corresponding to the chosen penetration from the
load-penetration curve, and
Ps = standard unit (or total) load for the same depth of penetration as for PT taken from
Table 17.2.
The CBR values are usually calculated for penetrations of 2.5 mm and 5 mm. Generally,
the CBR value at 2.5 mm penetration will be greater than that at 5 mm penetration and in
such a case the former shall be taken as the CBR value for design purposes. If the CBR value
corresponding to a penetration of 5 mm exceeds that for 2.5 mm the test shall be repeated. If
identical results follow, the CBR corresponding to 5 mm penetration shall be taken for design.
The CBR value shall be reported correct to the first decimal place.
Table 17.2 Standard load
Depth of Unit standard load Total standard load
Penetration (mm) kg/cm^2 kN/m^2 kg kN
2.5 70 6,867 1370 13.44
5.0 105 10,300 2055 20.16
7.5 134 13,145 2630 25.80
10.0 162 15,892 3180 31.20
12.5 183 17,952 3600 35.32