Geotechnical Engineering

(Jeff_L) #1
DHARM

872 GEOTECHNICAL ENGINEERING


Initial Velocity of Anvil after Impact


va =

()
()

1

(^11)






  • e v
    λ
    λ 1 =
    M
    M
    W
    W
    a
    t
    a
    t
    ==^1000
    50
    = 20
    Substituting e = 0.5, v = 6.2 m/s, and λ 1 = 20,
    va =
    (.)
    ()
    .
    105
    120
    62






  • × = 0.443 m/s
    Amplitudes
    The amplitude for the foundation-soil system
    A 1 = −
    −−

    ()()
    ()
    ωωωω
    ωω ω ω
    anan
    an n n
    va
    2
    2
    22
    1
    2
    2
    1
    2
    2
    2
    2
    Substituting ωa^2 = 45.126 × 10^3 , ωn 12 = 67.7744 × 10^3 , ωn 22 = 15.666 × 10^3
    and va = 0.443 m/s,
    A 1 = −
    −−
    ×−
    10 45 126 15 666 45 126 67 7744 0 443
    10 45 126 67 7744 15 6660 125 164
    6
    6
    (.. )(.. )(. )
    .(.. )(.)
    m
    = 1.00 mm
    The amplitude of the anvil
    Aa = −


    ()
    ()
    .
    ωω
    ωωω
    an
    nnn
    va
    2
    1
    2
    1
    2
    2
    2
    2
    = − −

    10 45 126 67 7744 0 443
    10 67 7744 15 6660 125 164
    3
    3
    (.. )(. )
    (.. )(. )
    m
    = 1.54 mm
    Stress in the Elastic Pad
    σp =
    kA A
    A
    a
    p
    21 ()−
    Substituting k 2 = 46 × 10^5 kN/m, Aa = 1.54 × 10–3m, A 1 = 1.00 × 10–3 m,
    and Ap = 5.5 m^2 ,
    σp =
    46 10 1 54 1 00 10
    55
    ×−×^5 (.. )
    .
    –3
    kN/m^2
    = 451.64 kN/m^2
    Final Values of Salient Quantities
    The Size of foundation: 7.5 m × 6.5 m × 1.5 m high.
    Estimated amplitude of motion of the foundation: 1.00 mm
    Estimated stress in the elastic pad: 452 kN/m^2.



Free download pdf