A Handbook of Human Resource Management Practice

(Tuis.) #1

676 ❚ Rewarding people


Figure 44.3 Design sequence


Communicate
as required
throughout
project

1 Decide to develop
scheme

4 Formulate
communication
strategy

3 Select, brief and
train design team

2 Prepare project
programme

5 Identify and define
factors

6 Define factor levels
to produce basic
unscored and
unweighted factor
plan

7 Select and analyse
test jobs

8 Test basic factor
plan

Amend initial factor
plan as necessary

10 Decide on
weighting

9 Develop scoring
model

11 Produce full factor
plan

12 Test the full factor
plan

Amend full factor plan
as necessary

13 Computerise as
required

14 Test computerised
system

Amend computerised
system as required

15 Apply scheme to
benchmark jobs
Free download pdf