CIVIL ENGINEERING FORMULAS

(Frankie) #1
SURVEYING FORMULAS 179

whereE 1 ,E 2 , E 3... are probable errors of the separate measurements.
Error of the mean is


(7.4)


whereEsspecified error of a single measurement.
Probable error of the mean is


(7.5)


MEASUREMENT OF DISTANCE WITH TAPES


Reasonable precisions for different methods of measuring distances are


Pacing (ordinary terrain): to
Taping (ordinary steel tape): to (Results can be improved by use of
tension apparatus, transit alignment, leveling.)
Baseline (invar tape): to
Stadia: to (with special procedures)
Subtense bar: to (for short distances, with a 1-stheodolite, averag-
ing angles taken at both ends)

Electronic distance measurement(EDM) devices have been in use since the
middle of the twentieth century and have now largely replaced steel tape mea-
surements on large projects. The continued development, and the resulting drop
in prices, are making their use widespread. A knowledge of steel-taping errors
and corrections remains important, however, because use of earlier survey data
requires a knowledge of how the measurements were made, common sources for
errors, and corrections that were typically required.


(^1) 
7000
(^1) 
1000
(^1) 
500
(^1) 
300
(^1) 
1,000,000
(^1) 
50,000
(^1) 
10,000
(^1) 
1000
(^1)  50 1  100
PEm
PEs
n


0.6745


B


d^2
n(n1)

Em

Esum
n




Esn
n




Es
n

TABLE 7.1 Probability of Error in a Single Measurement

Probability
Confidence of larger
Error level, % error
Probable (0.6745s) 50 1 in 2
Standard deviation (s) 68.3 1 in 3
90% (1.6449s) 90 1 in 10
2 sor 95.5% 95.5 1 in 20
3 sor 97.7% 99.7 1 in 370
Maximum (3.29s) 99.9 1 in 1000
Free download pdf