Graphic Design & Printing Technology
- Slide the new cover over the roller.
- Tie both ends of the sleeve.
- Wet the entire molleton in a sink.
- Install the roller in the press.
- Run the press to let the rollers run in and smooth the surface.
Roller pressure settings
New damper covers must be set for proper pressure after they are installed.
The following procedure can be used to check the dampener roller pressure
setting.
Prepare the dampening system for operation. Check the dampness of the
form roller. Let the dampener form roller run against the plate on the plate
cylinder for a few minutes. Lift the form roller and stop the press.
When the press is stopped, place two 1” X 8” strips of 0.005” thick acetate
sheet between the form rollers and the plate. Place one strip each at both
the ends.