Electric Power Generation, Transmission, and Distribution

(Tina Meador) #1
NEW

CONDUCTORS INSULATORS STRUCTURESFOUNDATIONS

COMPONENT STRENGTHS

LINE SIMULATIONS

LOADING EVENTS
PROBABILITY OF OCCURRENCE

PROBABILITY
OF
LINE
SURVIVAL

FIGURE 9.5 Line simulation study.


Member

Legs

Tension chord of
conductor arm

Tension chord of
OHGW arm

Foundation

Wind, no ice 115

110

35

25

6

2

2
2

2

3

3

3
3

(^33)
3
7
Wind, no ice
Controlling Climatic Loads
Ice, no wind
Ice, no wind
Controlling
Climatic
Load Condition
Controlling Load
Return Period
(years)
FIGURE 9.6 Simulation study output.

Free download pdf