Electric Power Generation, Transmission, and Distribution

(Tina Meador) #1
PULL SITE

Guy-WHENREQUIRED

TRAVELER GROUNDS

BOTH SIDES OF
ENERGIZED CROSSING

MID-SPANSPLICE SITE

GRID-WHENREQUIRED

GUY-WHENREQUIRED

GRID-WHEN
REQUIRED

GUY-WHENREQUIRED

PREVIOUSLY


SAGGEDCONDUCTOR

WHENREQUIRED

SAG SECTION

TENSION SITE

2 MILESMAXIMUM
BETWEENTRAVELER

GROUNDS-

14

24

16

1

15

6

6

(^1012)
(^89)
19
10
(^89)
13
716
(^52)
22
21
12
8
18
8
22
16
16
6
16
23
4
17
716
17
NOTE: CONDUCTORS TO ANCHORS (1) DELETED FOR CLARITY
17
6
20
1
4
B 7
C
8 A
D
3
22
716
SYN. ROPE
11
11
FIGURE 14.10
Tension stringing equipment setup.