I.43Index terms Links
Sewage-treatment method selection (Continued)
typical efficiencies 8. 51wet processes 8. 53Sewer systems
(see Storm-water and sewer systems and Sanitary sewer
system design)Shape factor 1. 97
Shear center 1. 49
Shear connectors 1. 162
Shear diagram:
for beam 1. 42for combined footing 2. 45Shear:
in beam 1. 41 1. 96 1. 97in bridge truss 1. 70 5. 50in column footing 2. 41in concrete slab, for composite action 1. 161of prestressed concrete 2. 53punching 2. 41 2. 46on riveted connection 1. 84for welded connection 1. 142Shearing stress (see Stress(es) and strain: shearing)
Shrink-fit stress 1. 35
Sight distance 5. 31
Similarity, hydraulic 6. 29
Sinking fund 9. 7
Slenderness ratio 1. 106
Slices, method of 4. 20
Slope, stability of:
method of slices 4. 20