SECTION 07550

MODIFIED BITUMEN MEMBRANE ROOFING (SBS)

Modified Bitumen Membrane Roofing (SBS)
UIHC #20X-0XX 07550-2

O. FM 1-29 Factory Mutual Loss Prevention Data Sheet 1-29

1.03 SYSTEM DESCRIPTION

A. UL or ASTM Class "A" Rating

It is the intent of this specification to provide a roof system with a UL or ASTM Class "A"
Rating and complete system approval for an FM I-90 wind uplift rating. The descriptions
given below are general descriptions.

SBS (Styrene-Butadiene-Styrene) modified bitumen sheet roofing reinforced with a fiberglass
mat meeting the requirements of Canadian General Standards Board (CGSB) Standard 37-GP-
56M and Underwriters Laboratories or ASTM Class A Fire Resistance Rating for the installed
slope. Surface membrane shall have factory applied mineral granules. Sheet materials shall
be applied with a roofing torch.

1.04 SUBMITTALS


A. Submit under provisions of Section 01330 - Submittals.

B. All submittals shall be subject to the Owner's review and approval.

C. Manufacturer's Product Data:


  1. Most recent copy of manufacturer's literature applicable to products and specifications
    to be used, including material characteristics, test data, installation recommendations,
    material safety data sheet (MSDS), and complete flashing details of system. MSDS
    sheets shall be submitted directly to the Owner.

  2. Specimen copy of manufacturer's warranty.


D. Manufacturer's Installation Instructions:


  1. Most recent copy of manufacturer's installation instructions for applicators detailing
    products and specifications to be used, including procedures for installation of
    membrane and flashing.


E. Manufacturer's Certificates:


  1. Copy of completed contractor's application form for manufacturer's warranty to be
    submitted to the Architect/Engineer at the same time as original is submitted to the
    membrane manufacturer.

  2. Copy of the contractor-submitted manufacturer's warranty form approved by the
    manufacturer. Note: The Contractor will not be permitted to start work until the
    approved warranty form is submitted to the Architect/Engineer.


F. Shop Drawings: