APPENDIX L
MATRIX OF RESPONSIBILITY – Typical Door Hardware/Security Installations
The following matrix defines the responsibility of what contractor will perform the required work:Definition of Responsibility:O OwnerGC General ContractorEC Electrical ContractorSIC Security Integration contractorLV Low Voltage Contractor – Division 27Device
RefDescription of Device Provided
ByPathway,
Rough InInstall
ByStartup CablingDSM Door Status Monitor SIC EC SIC SIC SIC
PIR/ALM PIR Detector w/Audible Alarm SIC EC SIC SIC SIC
RELAY Door Hold Open Relay SIC EC SIC SIC SIC
RDR HID Proximity Reader SIC EC SIC SIC SIC
PTE Push To Exit Device SIC EC SIC SIC SIC
PANEL Software House Control Panels SIC EC SIC SIC SIC
CAM CCTV Cameras – Analog SIC EC SIC SIC SIC
CAM CCTV Cameras – IP SIC EC SIC SIC LV
KEY Key Override (Mag Lock) SIC EC SIC SIC SIC
MON Monitor Point SIC EC SIC SIC SICSTRIKE Door Strike GC EC GC GC/SIC SIC
MAGLOCK Door Magnetic Lock GC EC GC GC/SIC SICOPER Door Auto Operator GC EC GC GC EC
ELEC HW Electrified Door Hardware GC EC GC GC GCPHONE Door Phone – Level 4 O EC O O LV
PH Wall Phone O EC O O LVRev Date 11.28.12
November 1, 2016