Architectural and Engineering Design Standards

(avery) #1
Drawing Number
1.9

Double Door - Level 1

Date:

UI Hospitals & Clinics
Iowa City Iowa 52242
Scale
4/27/2011

CV

Job Number

Serial Number Drawn By

Project
Documents

Revisions

Drawing Type
Card Access Details

None

Safety & Security Card Access Standards

1in conduit sleeve into JB from
unsecured side of door

Device Rough In Requirements
Device Description Opening
JB 4sq Junction Box on secure side of door. ¾ in sleeve to unsecured side of door. Cables will be routed from the cable pathway in the corridor thru this sleeve into the JB. S SecuredSide


Ceiling

Structure

J
Box

To Card Access Panel

½ in Flex Raceway with pull string

PIR / ALM

DSM DSM

F F

S

S

DSM

Door can be Single or Double Egress.
Coordinate with SSC and GC on Device locations

PIR
ALM
Secured
S Side
½ flex raceway from secured side of room into the wall down to the PIR/ALM location.
Provide 4sq box in wall with 1G mud ring horizontal.

DSM Use PIR / ALM raceway to PIR / ALM Box. Provide a pull wire from this box location to each DSM switch. F Frame

Typical applications :

November 1, 2016
Free download pdf