Construction-Phase Process
- Installing C ontractor prepa res roofing and roof related sheet metal submittals, FM
Global Roof Nav "Contractor Package" for each assembly, and preliminary F M Global Form X -2688 –
Application for Acceptance of Roofing System for e ach assembly, and submits to the Design Professional for
review. This submittal package s hall demonstrate that all aspects of the r oo f system a nd roof related sheet metal
work comply with the specifications and represent combinations of products that c omply with the specified
RoofNav Assembly Numbers. - Roofing manufacturer and Design Prof essional assist Contractor with thi s submittal, as necessary. Review and
revisions s hall proceed until the submittal i s judged to be capable of passing FM Global review and approv al. - Contractor then transmits roofing and roof r elated sheet metal submitta ls, F M Global
RoofNav "Contractor Package" f or each assembly, and FM Global Form X -2688 – Application f or Acceptance of
Roof ing System for e ach assembly to FM G lobal for review and approv al.
FM Global reviews and provides comments. If all of the prior s teps have been completed satisfactorily, FM Global
app roval should be a tur nkey process. This step, in conjunction with final field review, will provide the for mal
acceptance for the r oof s ystem.