Rev. 13 November 1, 2016
Page | 25
4.2 Division 02 – Existing Conditions
02 42 00 Selective Demolition
- Demolition of Lead Shielding: The material must be r emoved i ntact and sha ll not be damaged (torn, drilled,
sanded or abraded). If t he lead i s not separabl e from the r egular construction waste, Health P rotection Office
must be notified. Review the i nfor mation contained i n the Lead Safety Awareness training section of the
following li nk :
http://www.uiowa.edu/ ~hpo/training/training pa ge.htm - Demolition of Carpet: Carpet removed from spaces during remodeling shall be recycled if the manufacturer
of fers that option. - Capital Management will be responsible for asbestos testing, by using Steve Henneberry at the University of
Iowa Environmental Services (319- 335 -6477).