Architectural and Engineering Design Standards

(avery) #1

  • Rev. 13 November 1,

    • Page |





    1. GENERAL REQUIREMENTS



    • 1.1 Application of Design Standards

    • 1.2 Applicable Documents................................................................................................................................................

      • 1.2.1 Building Codes and Standards

      • 1.2.2 Reference Documents



    • 1.3 Risk Assessment/Infection Control

    • 1.4 Site Design Considerations

    • 1.5 Utility Energy Incentives

    • 1.6 Existing Hospital Finishes





    1. DESIGN DELIVERABLES....................................................................................................................................................



    • 2.1 Design Deliverable Requirements

      • 2.1.1 State of Iowa Board of Regents Submissions

      • 2.1.2 Schematic Design

      • 2.1.3 Design Development

      • 2.1.4 Construction Document

      • 2.1.5 Record Documents

      • 2.1.6 FM Global Roof Compliance Process







    1. DRAWINGS & SPECIFICATIONS



    • 3.1 UIHC Room Numbering





    1. ARCHITECTURAL & ENGINEERING STANDARDS



    • 4.1 Division 01 – General Requirements.....................................................................................................................

    • 4.2 Division 02 – Existing Conditions

    • 4.3 Division 03– Concrete

    • 4.4 Division 04 - Masonry

    • 4.5 Division 05 – Metals

    • 4.6 Division 06 – Wood and Plastics

    • 4.7 Division 07 – Thermal and Moisture Protection

    • 4.8 Division 08 – Openings

    • 4.9 Division 09 – Finishes

    • 4.10 Division 10 – Specialties

    • 4.11 Division 11 – Equipment for Roof Standards Update

    • 4.12 Division 12 – Furnishings



  • Rev. 13 November 1,

    • Page |

    • 4.13 Division 13 – Special Construction

    • 4.14 Division 14 – Conveying Equipment

    • 4.15 Division 21 – Fire Suppression

    • 4.16 Division 22 – Plumbing

    • 4.17 Division 23 – Heating, Ventilation, and Air-Conditioning (HVAC)

    • 4.18 Division 26 – Electrical

    • 4.19 Division 27 – Communications

    • 4.20 Division 28 – Electronic Safety and Security

    • 4.21 Division 32 – Exterior Improvements

    • 4.22 Division 41 – Material Processing & Holding Equipment



Free download pdf