Revision Date Description


13 11 /01/16 (^) • Updated cover photo



  • Replaced with Capital Management Logo

  • Updated introduction

  • Updated General Requirements, Sections 1.2 & 1.2.

  • Updated 1.2.2.6 Casework Standards

  • Updated 1.3 Risk Assessment/ Infection Control

  • Removed 1.5 Safety Considerations

  • Updated 1.7 Existing Hospital Finishes

  • Updated 2.1.2 Schematic Design Written Requirements Section

  • Updated 2.1.3 Design Development Written Requirements Section

  • Updated 2.1.4 Construction Document paragraph and Written Requirements and Drawing Requirements

  • Updated FM Global contact to Tom Lauer; Section 2.1.

  • Updated Construction-Phase Process Section

  • Removed Section 3.2 UIHC Standardized Details (3.2.1 & 3.2.2)

  • Updated Section 01 78 36; Warranties

  • Updated 4.2 Division 02- Existing Conditions; Added line 3

  • Updated 05 51 14 Prefabricated Metal Roof Access Ladders

  • Updated 06 20 00 Finish Carpentry

  • Updated 06 60 00 Solid Surfaces; Added lines 5, 6 & 7

  • Updated 4.7 Division 07 – Thermal and Moisture Protection

    • Added Building Insulation; 07 20 00

    • Updated 07 50 00 Membrane Roofing

    • Updated 07 54 19.02 Adhered PVC Thermoplastic Membrane Roofing

    • Updated 07 81 00 Fireproofing

    • Updated 4.8 Division 08 – Openings: Notes Section

    • Updated 08 12 00 Steel Door Frames

    • Updated 08 13 00 Hollow Metal Flush Doors

    • Updated 08 14 00 Flush Wood Doors; added line 9

    • Updated 08 31 00 Fire Rated Access Doors

    • Updated 08 33 23 Rolling Fire Doors

    • Updated 08 71 00 Door Hardware; Added line 8

    • Updated 08 74 00 Access Control Hardware

    • Updated 08 80 00 Glass and Glazing; added line 6

    • Updated 09 22 16 Non-Load Bearing Partition Framing

    • Updated 09 29 00 Gypsum Wallboard; updates to line 1

    • Removed 09 63 00 Masonry Flooring

    • Updated 09 65 16 Resilient Sheet Flooring

    • Added line 3 to Painting and Coding; 09 90 00

    • Added section Rolled Carpet; 09 68 16

    • Added section Acoustical Ceilings; 09 50 00

    • Added section Epoxy Quartz Flooring; 09 72 50

    • Added line 2 to Epoxy Paint; 09 96 56

    • Added section Signage; 10 14 00

    • Added section Corner Guards; 10 26 00

    • Updated 10 26 33 Kickplates

    • Added section Fire Extinguisher Cabinets; 10 44 00

    • Updated 10 90 00 Miscellaneous Specialties; added line 3

    • Removed Section 11 28 13 Computers

    • Added section Roller Shades; 12 24 13

    • Updated 21 12 26 Fire Surpression Valve and Hose Cabinets

    • Updated 21 13 13 Wet-Pipe Automatic Sprinkler System; added line 8

    • Updated 23 05 53 Identification for HVAC Piping and Equipment

    • Added line 6 to 22 60 00 Gas and Vacuum Systems for Lab and Healthcare Facilities

    • Updated 23 09 00; Line 4 TSI Model Pressura RPM

    • Added section Eye Wash; 22 45 19

    • Updated 26 05 33 Raceway and Boxes for Electrical Systems; EMT/Ridged (added Ridged)

    • Added section Wiring Devices; 26 27 26

    • Added Appendix M “Capital Management Design Process”