Rev. 13 November 1, 2016
Page | 6
Revision Date Description
13 11 /01/16 (^) • Updated cover photo
- Replaced with Capital Management Logo
- Updated introduction
- Updated General Requirements, Sections 1.2 & 1.2.
- Updated 1.2.2.6 Casework Standards
- Updated 1.3 Risk Assessment/ Infection Control
- Removed 1.5 Safety Considerations
- Updated 1.7 Existing Hospital Finishes
- Updated 2.1.2 Schematic Design Written Requirements Section
- Updated 2.1.3 Design Development Written Requirements Section
- Updated 2.1.4 Construction Document paragraph and Written Requirements and Drawing Requirements
- Updated FM Global contact to Tom Lauer; Section 2.1.
- Updated Construction-Phase Process Section
- Removed Section 3.2 UIHC Standardized Details (3.2.1 & 3.2.2)
- Updated Section 01 78 36; Warranties
- Updated 4.2 Division 02- Existing Conditions; Added line 3
- Updated 05 51 14 Prefabricated Metal Roof Access Ladders
- Updated 06 20 00 Finish Carpentry
- Updated 06 60 00 Solid Surfaces; Added lines 5, 6 & 7
- Updated 4.7 Division 07 – Thermal and Moisture Protection
- Added Building Insulation; 07 20 00
- Updated 07 50 00 Membrane Roofing
- Updated 07 54 19.02 Adhered PVC Thermoplastic Membrane Roofing
- Updated 07 81 00 Fireproofing
- Updated 4.8 Division 08 – Openings: Notes Section
- Updated 08 12 00 Steel Door Frames
- Updated 08 13 00 Hollow Metal Flush Doors
- Updated 08 14 00 Flush Wood Doors; added line 9
- Updated 08 31 00 Fire Rated Access Doors
- Updated 08 33 23 Rolling Fire Doors
- Updated 08 71 00 Door Hardware; Added line 8
- Updated 08 74 00 Access Control Hardware
- Updated 08 80 00 Glass and Glazing; added line 6
- Updated 09 22 16 Non-Load Bearing Partition Framing
- Updated 09 29 00 Gypsum Wallboard; updates to line 1
- Removed 09 63 00 Masonry Flooring
- Updated 09 65 16 Resilient Sheet Flooring
- Added line 3 to Painting and Coding; 09 90 00
- Added section Rolled Carpet; 09 68 16
- Added section Acoustical Ceilings; 09 50 00
- Added section Epoxy Quartz Flooring; 09 72 50
- Added line 2 to Epoxy Paint; 09 96 56
- Added section Signage; 10 14 00
- Added section Corner Guards; 10 26 00
- Updated 10 26 33 Kickplates
- Added section Fire Extinguisher Cabinets; 10 44 00
- Updated 10 90 00 Miscellaneous Specialties; added line 3
- Removed Section 11 28 13 Computers
- Added section Roller Shades; 12 24 13
- Updated 21 12 26 Fire Surpression Valve and Hose Cabinets
- Updated 21 13 13 Wet-Pipe Automatic Sprinkler System; added line 8
- Updated 23 05 53 Identification for HVAC Piping and Equipment
- Added line 6 to 22 60 00 Gas and Vacuum Systems for Lab and Healthcare Facilities
- Updated 23 09 00; Line 4 TSI Model Pressura RPM
- Added section Eye Wash; 22 45 19
- Updated 26 05 33 Raceway and Boxes for Electrical Systems; EMT/Ridged (added Ridged)
- Added section Wiring Devices; 26 27 26
- Added Appendix M “Capital Management Design Process”