Project #:Date:LEED Final Review (If Applicable)Communication CD DrawingsArchitectural CD Drawings
Mechanical CD Drawings per Section
Electrical CD DrawingsComplete Specification with UIHC Front End DocumentsApproval to Bid From the State Fire Marshal's OfficeCONSTRUCTION DOCUMENTS: Required Deliverables Checklist (90%)Design Professional:
Project Title:Copy of the Energy Code Statement of Review (If Applicable)Final Space Program (If Changes have Occurred)The Construction Document should be a refinement of the Design Development documents. No new items are to be
included at this stage but all portions of documents should be fully detailed and all elements that relate to
constructability defined.
Final Code Analysis (If Changes have Occurred)Draft Advertisement for BidFinal Interior Finish Color Boards
Statement of Coordination for Above Ceiling Utilities
Final Construction Cost Estimate
Updated Project Schedule with Construction DurationsFinal Basis of Design Document (If Changes have Occurred)August 1, 2016