Project #:
Date:
LEED Final Review (If Applicable)
Communication CD Drawings
Architectural CD Drawings
Mechanical CD Drawings per Section
Electrical CD Drawings
Complete Specification with UIHC Front End Documents
Approval to Bid From the State Fire Marshal's Office
CONSTRUCTION DOCUMENTS: Required Deliverables Checklist (90%)
Design Professional:
Project Title:
Copy of the Energy Code Statement of Review (If Applicable)
Final Space Program (If Changes have Occurred)
The Construction Document should be a refinement of the Design Development documents. No new items are to be
included at this stage but all portions of documents should be fully detailed and all elements that relate to
constructability defined.
Final Code Analysis (If Changes have Occurred)
Draft Advertisement for Bid
Final Interior Finish Color Boards
Statement of Coordination for Above Ceiling Utilities
Final Construction Cost Estimate
Updated Project Schedule with Construction Durations
Final Basis of Design Document (If Changes have Occurred)
August 1, 2016