Table 30.9.
HACCP
control chart for fresh sausages
Process steps
Preventive Action
CCP
/CP
Critical limits
Monitoring
Corrective actions
Verifi
cation
Procedure
Frequency
Reception of
raw materials (meat trimmings, casings, ingredients/additives)
Suppliers selected and
homologated and/or certifi
ed: agreed
specifi
cation
(maximum acceptable levels)
Visual check ( “ Best
Before ” dates)
Temperature of meat
( <
− 12 ° C)
CP - GHP/
GMP
Presence of certifi
cates
or stamp of homologation, legal limits
“ Best Before ” date Temperature of meat
( <
− 12 ° C)
Visual check of
certifi
cates (or
stamp of homologation) and “ Best Before ” date, check ingredients
Measurement of
meat temperature
100% 20% 20% of batch
Reject batch; Contact supplier Change supplier
Raw materials microbial
and chemical analysis according to planned sampling
Suppliers audits Calibration of
thermometers
Check temperature
against calibrated thermometer
Data record analysis
Storage of raw
materials
Temperature of frozen
room
Temperature and
relative humidity of refrigeration room
Effective stock rotation,
time of storage (fi
rst
in fi
rst out)
CP - GHP/
GMP
Frozen room temp.
( <
− 12 ° C);
Refrigeration room
temp. 2
± 2 ° C
RH = 85
± 5%;
“ Best before ” Date
Measurements of
frozen room temperature, refrigeration room temperature and relative humidity
Visual check of
labels to ensure stock rotation
On line 20%
Correction of
temperature and relative humidity
Segregation of meat
and evaluation of its hygiene and safety
Reject product at
end of shelf life
Calibration of
thermometer and hygrometer
Unfrozen pork
trimmings
Temperature and
relative humidity of refrigeration room
CP - GHP/
GMP
Refrigeration room
temp. 2
± 2 ° C
RH = 85
± 5%;
Measurements of
refrigeration room temperature and relative humidity
On line
Correction of
temperature and relative humidity
Segregation of meat
and evaluation of its hygiene and safety
Calibration of
thermometer and hygrometer
Casing desalting
Time of desalting GMP
CP - GHP/
GMP
Time of desalting
< 2 h
Measurement of
time
100%
Reject batch Training operators
Data record monitoring
analysis