Chapter 15. Complete a Thorough Root Cause Analysis 351

Figure 15-9. Stack chart of work element times


In addition to the time required for each element, it’s useful to understand
the problem visually by depicting the flow of work (Figure 15-10). This pictorial
flow is captured on the Standardized Work Sheet (Chapter 6).


Machine

Parts
Supply

Inspection

Finished
Parts

1

2

Machine
Start
3

4

5

6

Figure 15-10. Visual depiction of work flow