across the operations, leading to major improvements in productivity, quality,
and safety.


Sequential and Concurrent Continuous Improvement


Initially the implementation begins with reaching a basic level of stability with-
in one cell or line—known as “disconnected stability” (see Figure 3-5, below)—
which is not connected to its customer process or its supplier process. If the
process is a cell or line (multiple operations within one area), the flow phase can


52 THETOYOTAWAYFIELDBOOK

Level Incrementally

Standardize

Create Flow

Stabilize

Single
Operation

"Disconnected Stability"
Stability of a single operation

Single
Operation

Single
Operation

"Multiprocess Connected Stability"
Stability of multiple operations

Level Incrementally

Standardize

Create Flow

Stabilize

Single
Operation

Level Incrementally

Standardize

Create Flow

Stabilize

"Value Stream Connected Stability"
Stability of a Value Stream


Single
Operation

Single
Operation

Single
Operation

Figure 3-5. From disconnected stability to value stream connected stability