Downstream

(Jeff_L) #1

Sewer,’ he explains. Work is
scheduled to begin on the
Thames Tideway Tunnel –
otherwise known as the Super
Sewer – in 2015, if it gets
planning permission. At
twenty miles long, it will
connect with thirty-four of
the most polluting sewer
overflows and by 2023 will
‘catch 96 per cent of the
current levels of sewage
discharge’.
Studio Octopi’s original

Free download pdf