Organic Waste Recycling

(WallPaper) #1
Algal production 237

Figure 5.7. Three modes of HRAP operation.


Figure 5.8 Advance integrated wastewater ponding system (Pilot plant at the University
of California, Berkeley, Richmond Field Station, USA)


1

ANNUAL
BIOMASS
PRODUCTION
(tons)

DEPTH (m)

RETENTION TIME (days)

AREA (km^2 )

DUAL
FUNCTION

VARIABLE
DEPTH

CONSTANT
RETENTION TIME

2 3

3 2.5-5
0.45

3, 6

Algae

0.100 0.125 0.100 0.100

1800

(^19201840)
680
1040
0.3-0.6 0.45
940

Free download pdf