Algal production 237
Figure 5.7. Three modes of HRAP operation.
Figure 5.8 Advance integrated wastewater ponding system (Pilot plant at the University
of California, Berkeley, Richmond Field Station, USA)
1
ANNUAL
BIOMASS
PRODUCTION
(tons)
DEPTH (m)
RETENTION TIME (days)
AREA (km^2 )
DUAL
FUNCTION
VARIABLE
DEPTH
CONSTANT
RETENTION TIME
2 3
3 2.5-5
0.45
3, 6
Algae
0.100 0.125 0.100 0.100
1800
(^19201840)
680
1040
0.3-0.6 0.45
940