WORKING DRAWINGS HANDBOOK, Fourth Edition
Working Drawings Handbook The increasing use of CAD, of course, has blurred the separation of the various work stages described ...
Working drawing management 5.1 Final design drawing as issued to the client for approval. Presentation techniques are designed t ...
Working Drawings Handbook 5.2 Copy taken from 5.1before the blandishments were added. Scale and simple draughting make it suitab ...
Working drawing management presentation features possibly remaining as an invisible layer in the set. Statutory approvals A chic ...
Working Drawings Handbook 5.3 Copy taken from 5.2and marked up as a briefing guide to the drawing office at stage E ...
Working drawing management Outline specification The case is argued elsewhere in this handbook for a specification which is an i ...
Working Drawings Handbook 5.4 Manufacturer’s catalogue gives precise fixing details. It is pointless to redraw this information ...
Working drawing management On the other hand, it is frustrating to realise that the detail being worked out laboriously in one r ...
Dates Major activitiesClient Architectdesign functionArchitectmanagement functionQuantity surveyorStructural engineerServices en ...
Working drawing management 5.6 A less sophisticated network, with the advantage that the time scale is immediately apparent. Mor ...
Working Drawings Handbook Planning the set The structure of the final production set of drawings is central to both the smooth r ...
Working drawing management strip sections rather than the traditional ‘section through the building’, work systematically round ...
Working Drawings Handbook and in a loose leaf format so that sheets may be removed and inserted easily. A4 is the obvious size, ...
Working drawing management Table V General arrangement drawings listed as they would appear in the drawing register Drawing numb ...
Working Drawings Handbook G(3–)001 1:100 Plan at level 1—Secondary elements This series is used in this particular set as a 002 ...
Working drawing management G(7–)001 1:100 Plan at level 1—Fixtures Self-explanatory, although it might be questioned what 002 2 ...
Working Drawings Handbook Table VI Assembly drawings, component drawings and schedules listed as they would appear in the drawin ...
Working drawing management Component and sub-component drawings* Drawing number C (31) 001— 008 1:20 External openings component ...
Working Drawings Handbook 5.8 A useful format for the drawing register. The explanatory notes help site staff as well as the dra ...
Working drawing management Working drawing management It may not be released for construction, however, until it becomes: K:Cons ...
«