WORKING DRAWINGS HANDBOOK, Fourth Edition

(sharon) #1

The structure of information


Table II Uniclass Table G


Elements for buildings G


G1 Site preparation G11 Site clearance
G12 Ground contouring
G13 Stabilisation
G2 Fabric: complete G21 :G311 Foundations
elements (foundations consist
entirely of core fabric)
G22 Floors
G221 Lowest floors :G311 Core fabric
:G331 Floor finish to lowest
floors
1 Direct
2 Raised floor
G222 Upper floors :G311 Core fabric
:G331 Floor finish to upper floors
1 Direct
2 Raised floor
:G332 Ceillings/soffit finishes to
upper floors
1 Direct
2 Suspended
G23 Stairs Balustrades are at G251 and
G252. However, if preferred,
balustrades to stairs/ramps may be
included here.
:G311 Core fabric
:G33 Stair finish
11 Top
21 Soffit
G24 Roofs :G311 Core fabric
:G312 Roof coverings
:G321 Roof lights
:G332 Roof soffit finishes/ceilings to roofs
1 Direct
2 Suspended
:G34 Roof edges
Includes parapets, gutters,
etc. Rainwater downpipes
are at G5812.
:G25 Walls
G251 External walls Includes external balustrades.
:G311 Core fabric
:G312 Coverings/external finishes
to external walls
:G321 External windows