WORKING DRAWINGS HANDBOOK, Fourth Edition

(sharon) #1

The general arrangement drawing


coded (43) and dealing solely with floor finishes, which
will serve as a base drawing for dealing with nominated
suppliers, finishes pertaining to walls and their ancillaries
for any room other than the most simply decorated are
best dealt with by a series of internal elevation sheets
covering the whole project on a room-by-room basis.


Figure 2.6shows a workable format for this and
demonstrates its use in positioning accurately those
miscellaneous items which if otherwise uncoordinated


are apt to make an unexpected and unwelcome visual
impact during a site visit late in the contract.

Specific problems arise when we come to ceilings,
services and finishes. Some consideration must be given
to the best method of documenting these, for boundaries
tend to overlap and clear thinking is essential.

Ceiling Finishes Ceiling finishes complete the room
but before simply opting for a (45) coded reflected

2.4 Coded system of finishes in room 1/18 compares favourably with over-elaborate annotation of finishes for
room 1/9

Free download pdf