Blueprint Reading

(Joyce) #1

Layout of Construction Drawings 121


utes, and seconds. The lot line may read N6o 49' 29" W. The compass is divided into four quadrants,
NW, NE, SW, and SE.
There are many reasons to plat:



  • To designate roads and other rights of way

  • To make sure that all property has access to a public right of way

  • To create or vacate easements

  • To dedicate land for other public uses, such as parks or areas needed for flood protection

  • To ensure compliance with zoning


Demolition Plan.


Many projects will be constructed on sites with existing features or exterior or interior elements that are
not envisaged to be part of the final design. These will need to be removed or demolished prior to grad-


Figure 6.5 An example of a plat map. A plat represents the first of several stages in a site’s development.

Free download pdf