The Knitter - UK (2019-08)

(Antfer) #1

66: 66 :70: 74 ) sts for each sleeve.


DIVIDE BODY AND SLEEVES
Wit h R S fa c i n g, re m ove mrk , k n it to
next mrk, remove mrk, place next
56 ( 56 :58: 62 :68: 70 :66: 66 :70: 74 ) sts on
holder for sleeve, remove mrk, cast on
3 ( 5 :6: 6 :5: 6 :9: 9 :9: 9 ) sts, pm, cast on
3 ( 5 :6: 6 :5: 6 :9: 9 :9: 9 ) sts; rep from
once
more.
Last mrk placed counts as new beg of rnd
mrk.
Joi n on c e m ore to work i n t h e r n d.


Next rnd: K n it to e n d of r n d.
172 ( 180 :192: 200 :212: 220 :232: 240 :252: 260 )
sts.


BODY
Knit 30 ( 6 :10: 15 :63: 7 :12: 20 :6: 8 ) rnds.
Inc rnd: K2, M1R, knit to 2 sts before next
mrk, M1L, K2; rep from
once more.
4 sts inc’d.
Rep last 31 ( 7 :11: 16 :64: 8 :13: 21 :7: 9 ) rnds
1 ( 8 :5: 3 :0: 7 :4: 2 :8: 6 ) more times.
180 ( 216 :216: 216 :216: 252 :252: 252 :288: 288 )
sts.


CHART BLOCKING DIAGRAM


Knit 1 rnd.

WORK CHART
Work rnds 1-30 of Chart, working 36-st
repeat 5 ( 6 :6: 6 :6: 7 :7: 7 :8: 8 ) times across
each rnd.

With yarn A, knit 1 rnd.
Cut yarn A and join yarn B.
Knit 1 rnd, purl 1 rnd.
Rep last 2 rnds once more.
Cast off all sts.

SLEEVES
Using 4mm DPNs and yarn A, knit across
56 ( 56 :58: 62 :68: 70 :66: 66 :70: 74 ) sleeve sts,
pick up and knit 3 ( 5 :6: 6 :5: 6 :9: 9 :9: 9 ) sts to
centre of underarm, pm, pick up and knit
3 ( 5 :6: 6 :5: 6 :9: 9 :9: 9 ) more to underarm
edge. Join to work in the rnd.
62 ( 66 :70: 74 :78: 82 :84: 84 :88: 92 ) sts.

Knit 4 rnds.
Cut yarn A and join yarn B.

Rnd 1: Knit.
Rnd 2: Purl.

Rep last 2 rnds once more.
Cast off.
Repeat for other sleeve.

NECKBAND
Using 60cm circular needles and yarn B,
and with RS facing, pick up and knit
30 ( 30 :32: 32 :34: 34 :34: 34 :36: 36 ) sts along
back neck, 6 ( 6 :6: 6 :6: 6 :8: 8 :8: 8 ) sts across
top of left sleeve, 8 ( 8 :9: 9 :10: 8 :8: 8 :9: 8 ) sts
down left front neck, 12 ( 12 :12: 12 :12: 16 :16:
16 :16: 18 ) sts across front cast-on, 8 ( 8 :9: 9 :
10: 8 :8: 8 :9: 8 ) sts up right front neck, then
6 ( 6 :6: 6 :6: 6 :8: 8 :8: 8 ) sts across top of right
sleeve.
Join to work in the rnd.
70 ( 70 :74: 74 :78: 78 :82: 82 :86: 86 ) sts.

Rnd 1: Knit.
Rnd 2: Purl.
Rep last 2 rnds once more.
Cast off.

TO MAKE UP
Weave in ends. Block garment gently to
measurements, following any yarn care
instructions on the ball band.

35 30 25 20 15 10 5

1

3

5

7

9

11

13

15

17

19

21

23

25

27

29

2

4

6

8

10

12

14

16

18

20

22

24

26

28

30

KEY
Yarn A
Yarn B
Bobble

YARN


West Yorkshire Spinners Illustrious DK (DK weight; 70% Falkland wool, 30% British alpaca;
225m/245yds per 100g ball
A OLD LACE
(010)^3444555556

x100g
BALLS

B HEATHER
(828)^1111111111

x100g
BALLS

SPECIAL ABBREVIATIONS
MB: Make a bobble. Knit into front, back,
and front of the same st, transfer these
3 sts back to the LH needle, purl these
sts together.
KBF: Knit into back and front of same
stitch. 1 st inc’d.
For general abbreviations, see p

Dot to Dash


The Knitter 11 Issue 141


44¾ ( 47 :50¼: 52 :55¼:
57½:60¼:62½:65¾:67¾) cm

3 cm

65

(^6

6 ½

:^6

9 :

70

½

:^7
2 ½

:^7
2 ½

:^70

½

:^7
2 :
73

:^7
5 )

c
m
Free download pdf