Low Carbon Urban Infrastructure Investment in Asian Cities

(Chris Devlin) #1

30 T. WAKIYAMA ET AL.


TEPCO press release 2012 (Japanese). http://www.tepco.co.jp/cc/press/
2012/1205626_1834.html
Green investment tax cuts, METI http://www.enecho.meti.go.jp/category/
others/green_tax/greensite/green/
Registered government-approved FIT is renewable energy capacity at the reg-
istration level. The capacity has not been installed. In case of solar PV, there
was no obligation to obtain land certificate for a site to be installed and to
install it in a specific time period since it was registered before April 2014.
Registered government-approved renewable capacity (more than 50  kW of
solar PV) must operate within 180 days following approval. Otherwise, per-
mits are cancelled under the revised rule (METI 2014b).
Feed-in tariff publication of installed capacity. Ministry of Economy, Trade and
Industry (METI) (Japanese). http://www.fit.go.jp/statistics/public_sp.html
Feed-in tariff publication of installed capacity. Ministry of Economy, Trade and
Industry (METI) (Japanese). http://www.fit.go.jp/statistics/public_sp.html
Reuters 25 September 2014. Japan’s Kyushu Electric Power Company shuts off
renewable suppliers from grid. http://uk.reuters.com/article/2014/09/25/
us-japan-renewables-rejection-idUKKCN0HK0WY20140925

reFerences


Asano, K. 2013. Total and additional costs estimation for renewable electricity sup-
port policies in Japan. Central Research Institute of Electric Power Industry
(Japanese).
Ayoub, N., and N. Yuji. 2012. Governmental intervention approaches to promote
renewable energies—Special emphasis on Japanese feed-in tariff. Energy Policy
43: 191–201. doi:10.1016/j.enpol.2011.12.056.
Beck, F., and M. Martinot. 2004. Renewable energy and barriers. In Encyclopedia
of energy, vol. 5, ed. C.J. Cleveland. San Diego: Elsevier Science.
Blyth, W., R.  Bradley, D.  Bunn, C.  Clarke, T.  Wilson, and M.  Yang. 2007.
Investment risks under uncertain climate change policy. Energy Policy 35(11):
5766–5773. doi:10.1016/j.enpol.2007.05.030.
Buckman, G. 2011. The effectiveness of Renewable Portfolio Standard banding
and carve-outs in supporting high-cost types of renewable electricity. Energy
Policy 39(7): 4105–4114. doi:10.1016/j.enpol.2011.03.075.
Carrasco, J.M., L.G.  Franquelo, J.T.  Bialasiewicz, E.  Galvan, R.C.P.  Guisado,
M.A.M. Prats, J.I. Leon, and N. Moreno-Alfonso. 2006. Power-electronic sys-
tems for the grid integration of renewable energy sources: A survey. IEEE
Industrial Electronics 53(4): 1002–1016.
CAS. 2010. 2011 Fiscal year Tax Reform Outline (Japanese). http://www.kantei.
go.jp/jp/kakugikettei/2010/h23zeiseitaikou.pdf
CAS. 2012. Cost verification committee report. December 19, 2011 (Japanese).
http://www.cas.go.jp/jp/seisaku/npu/policy09/archive02.html

Free download pdf