The project included the demolition of existing buildings
and the design and construction of new single living
accommodation buildings with associated facilities at
Robertson Barracks.

The Robertson Barracks project included a total of 686
individual accommodation units. It also included: services
infrastructure, access roads, car parking, landscaping,
enclosed boat and trailer parking and covered all weather
walkways linking the accommodation buildings to the
existing facilities available within the Barracks.

BUSLINK VIVO DEPOT HOWARD SPRINGS


Another demonstration of Sitzler’s capacity to successfully
work with clients, local authorities and subcontractors; a
flexible design solution allowed the majority of the facility to
be fabricated off site.

This 3.35Ha site includes a workshop facility, washbays, re-
fuelling facility including a 100,000L diesel fuel tank, a large
administration building and extensive hardstand to store a
large number of buses.

Robertson Barracks


Buslink Vivo Depot Howard Springs


PROUD TO BE A PART OF THE MCLEISH AND MATTHEWS TEAM