Your Home and Garden – September 2019

(Ron) #1

ADVERTISING PROMOTION


YOU HAVE THE CHOICE
Attached to house eg studio/granny flat
Extension eg carport
Connected eg kindergarten
Elevated eg sloping site
Top-storey addition, or stacked
Free standing

G


erhardandSinafromAvondale,
Auckland,areveryexcitedabouttheir
newnon-toxic,environmentallyfriendly
home.Thehome,builtbyGerman
companyFlyingSpaces®, willlastforgenerations
andwillbeextremelyeconomicaltorun.
BeingGermanhimself,Gerhardwasalready
familiarwiththereputationofFlyingSpaces®
forprecisionduringitsdesign,manufacturing
andshippingprocesses,andwasexcitedtohear
thehomesarenowavailableinNewZealand.
Thecompanyhaveconstructed40,000homes
since 1950 andsourceswoodforitsconstruction
froma sustainableforestnearitsfactory.
SohowdoestheFlyingSpaces®processwork?

STAGE 1
LOCKINGINTHEDESIGN
ThecustomermeetswithFlyingSpaces®'
on-the-groundteamandlicencedbuilding
practitionerwhochecksit'spossibletodeliver
a FlyingSpaces®tothesiteandlooksinto
securinga buildingconsentforthesection.

STAGE 2
PLACINGTHEORDER
Thefinancialtermsandconditionsof the
contractareagreeduponandanorderis placed
withthefactoryinGermany.Atthesametime
theFlyingSpaces®architectandcustomerstart
theplanningandlayoutprocesswhilethe
licencedbuildingpractitionerworksonthe
buildingconsent.

For more information and pricing options contact Dean Dalton,
FlyingSpaces Construction NZ Ltd – [email protected]
or phone 021 271 7043, schwoererhaus.com/en-gb/flyingspaces.

Factory to site


Fromfinalisingdesigntothedayoftouchdownandsettlingin,we
sharea step-by-stepguidetoowninga FlyingSpaces®passivehouse

CS25249 09/19 ADVT2019


LOGISTICS
PASSIVE HOUSE

PART THREE
OF A
FOUR-PART
SERIES

STAGE 3
PRODUCTION GOES AHEAD
After receiving the building consent, the
FlyingSpaces® is built in our state-of-the art
German factory. This takes one to two weeks.

STAGE 4
ARRIVING IN NEW ZEALAND
Shipment from Germany to New Zealand
is included in the base price. After a journey
of about fi ve weeks the fully equipped
FlyingSpaces® house arrives and is
independently checked at the port. Once
cleared by Customs it's transported to its
new location on a low loader and lifted on to
the foundations using a crane. The transport
costs depend on a number of factors such
as distance and the size of the FlyingSpaces®
home. All power, water, waste water and
communications are connected that same day.

STAGE 5
THE FLYINGSPACES® HOUSE IS A HOME
The customer sleeps in the FlyingSpaces®
passive house that same night. The whole
process from fi rst meeting until delivery
takes between six and eight months.
Free download pdf