34 Spin Off • http://www.interweave.com
PROJECT
Stitch Guide
M1: K1 with both yarns held tog.
Mitts
Cuff
With larger needles and using the twined-knitting
method, CO 64 sts.
Undo the slipknot and make a braid of the 4 yarn ends
to mark beg of rnd.
Change to smaller needles.
Work Rows 1–20 of Wrist chart.
Thumb gusset
Right mitt only:
Next rnd Work Hand chart over 32 sts, place marker
(pm), M1 (see Stitch Guide), twine knit to end—65 sts.
Inc rnd Work in patt to m, sl m, M1, twine knit to
end—1 st inc’d.
Rep inc rnd every rnd 8 more times—74 sts.
Rep inc rnd every other rnd 8 times—82 sts.
Divide for thumb
Next rnd Work in patt to m, sl m, place next 22 sts on
holder for thumb, using the backward-loop method and
alternating yarns, CO 4 sts, twine knit to end—64 sts rem.
Left mitt only:
Next rnd Twine knit 32 sts, M1, place marker (pm),
work Hand chart to end—65 sts.
Inc rnd Twine knit to m, M1, sl m, work in patt to
end—1 st inc’d.
Rep inc rnd every rnd 8 more times—74 sts.
Rep inc rnd every other rnd 8 times—82 sts.
Divide for thumb
Next rnd Twine knit 28 sts, place next 22 sts on holder
for thumb, using the backward-loop method and alternating
yarns, CO 4 sts, sl m, work in patt to end—64 sts rem.
Top of Hand (both mitts)
Work even in patt to end of chart.
Work 3 crook rnds.
BO all sts in twined St st.
8-st rep
37
35
33
31
29
27
25
23
21
19
17
15
13
11
9
7
5
3
1
Hand
twine knit
crook st
Key
(see page 32)
pattern repeat
8-st rep
19
17
15
13
11
9
7
5
3
1
Wrist