L- S B C
07 | The Scat forged 3.750-inch crankshaft is
carefully lowered into place in the engine block.
08 | The engine’s mains are torqued according
to the proper sequence in three stages. The final
torque values on the outer bolts are 65 ft-lb while
the inner main bolts get a snugger 70 ft-lb.
09 | Each rod cap was disassembled and the
bearings inserted. Assembly lubricant is liberally
applied to the bearing surface on both the rod and
cap side.