LAY OUT THE FOOTPRINT
Snap chalk lines outlining the shed walls and extend-
ing to the post locations. To mark the post locations, lay
out a corbel and some offcuts of the posts. Double-check
the accuracy and squareness of your layout; mistakes will
waste time and cause frustration later.2
FRAME THE SHED
Build the walls, then plumb and brace them. The walls
are standard framing but are more than 9 ft. tall. The
bottom plate is doubled so the siding can be raised 1-1/2
in. off the concrete.3
STAND
THE
FIRST
POSTS
Bolt down post
bases and stand
the rear outer
posts—the other
posts come later.
Brace the posts to
the shed. When
both posts are up,
install a horizontal
ledger between
them (see Photo 4).CorbelPost
locationsBraceDouble
bottom platePost
baseWedge
anchorBrace