Overhead and Contingencies 49FIGURE 6.5.Sample Schedule.Ladders and stairs—used prior to permanent ones being
installed
Temporary partitions—used to separate new construc-
tion from existing facilities
Temporary closures for doors and windows
First aid
Construction elevators, hoists, and cranes
Noise control
Dust control
Water control
Te l e p h o n e
Heat
Lights and power
Computers
Stationery
Project sign and associated signageTo Estimate Cost
Labor Typically none, except for office set-upMaterials/EquipmentBarricades and Signal Lights
Building and maintaining barricades
Cost of maintaining signal lightsTo Estimate Cost
LaborMaterial
Quantity of materialsUnit priceQuantity of materialsProductivity ratePest/rodent control Duration required at job siteMonthly cost
To Estimate Cost
Labor
MaterialTemporary Office
Temporary job office
Temporary office for architect/inspector
Quantity requiredUnit costQuantity requiredProductivity rate