GettinG stARted
Worked from the top down.
Buttonhole Knit
Over One Row:
Knit to the point where the
buttonhole will be placed.
Slip the first stitch on the left
needle as if to knit.
Move the yarn to the front of
the work and leave it there.
Slip the next stitch from
the left needle to the right
needle as if to knit. Pass the
first slipped stitch over the
second slipped stitch and off
the needle. Repeat until you
have bound off the number
of required stitches for the
buttonhole.
Slip the last stitch from
the right needle back to
the left needle. Turn. Bring
the yarn to the front of the
work. At the edge where the
buttonhole was begun, cast
on the number of stitches
you bound off plus one
additional stitch. Turn. Slip
the first stitch from the left
needle to the right needle as
if to knit. Pass the extra cast
on stitch over the next stitch;
then slip this stitch back to
the left needle.
WORKinG PAtteRn
cOLLAR
Cast on 83(83,87) sts. Work 3
rows garter st.
YOKe
Row 4: set up row -
K14(14,15) Pm, K1, Pm, K11,
Pm, K1, Pm, K28(28,30) Pm,
K1, Pm, K11, Pm, K1, Pm,
K15(15, 16).
Row 5: first increase row
- Knit to marker, M1, Slip
marker, K1, Slip marker,
M1,(two stitches added)
Repeat from* 3 times, Knit to
end.
Row 6: WS - K3, work button
hole, Knit to end.
Repeat Rows 5 and 6 a total
of 16(18, 21) times working
a buttonhole on an even row
every 5cm. 211(227, 255) sts.
Remove Markers on last row.
Next Row: increase RS - K7(7,
8), Pm, increase 41(38,41) sts
by working a “first increase”
evenly spaced across the
centre 197(213, 239) sts, Pm,
K7(7, 8)
Work at least 3 more rows
in garter st, ending with a
WS row.
Continue to work in garter
stitch until when you try
on the sweater the sleeves
stitches almost meet under
your arms.
Body Section Keeping garter
st borders correct (the first
and last 7(7,8) stitches of each
row Knit) working remaining
centre stitches in stocking
stitch.
Work 4 rows
Separating the Sleeves
K7(7, 8), Slip Marker, K28(31,
35) for right front, slip 56(56,
63) sleeve stitches onto scrap
yarn, cast on 8 sts on right
hand needle, K70(77, 84)
sts for back, Slip 56(56, 63)
sleeves stitches onto scrap
yarn, Cast on 8 sts on right
hand needle, K28(31, 35) for
left front, slip marker, K7(7, 8).
156( 169, 186)body stitches.**
Continue on stocking st with
garter edging until body is
4cm shorter than desired
length.
Work 4cm of garter st for the
bottom band. Cast off using
6.50mm needle.
With Noro Kureyon being
a self striping yarn, to soften
the changing colours around
the body section, the option
of knitting with a separate
ball of yarn for each piece
(1 for each fronts and a third
for the back) are as follows
Work as main pattern to**
Next row K7(7, 8), slip marker,
Purl to marker, slip marker,
K7 (7,8).
Next row K7(7, 8), slip marker,
K 32( 35, 39)sts, join in 2nd
ball of yarn & Knit next 78(85,
92)sts
Join in 3 rd ball of yarn and
knit remainder of stitches of
left front.
Continue as set by twisting
This smart looking little jacket is versatile and comfortable to wear. Kureyon
is a pure wool and available in a great selection of hand dyed colour stories.
sHOrt sLeeVe
ButtOneD Vest
WHatYOu'LLneeD
sKILL LeVeL
Yarn
6 (7, 7, 8) balls of Noro
Kureyon worsted weight
Pure Wool
3 large buttons
needles
5mm 80cm circular
needle
5mm double-pointed
needles or 40cm
circular needle
6.50mm needle
for cast off
Stitch ring markers
special Abbreviations
M1 Paired increases first
increase: of each pair:
using the left needle,
pick up horizontal strand
between last stitch and
next stitch, from the front.
Knit through the back loop.
second increase: using
the left needle, pick up
the strand from the back
and knit
Pm Place Maker
Tension
Tension 18st to 10cm in
stocking stitch
intermediate
Creative Knitting 27